Guide prices in Gloucestershire
Onto a ready upstand
Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed
With a new upstand
Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed
Large or heavy unit
Extra hands or lifting gear, larger openings, fixed or opening units
Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Towns we list in Gloucestershire
Builders and roofers working in Gloucestershire can use us for the rooflight element of a job, wherever the site is in England. Homeowners can book us directly. In both cases the fitters come to the address, the work follows the maker's instructions, and a written quote fixes the price first. Fitting is carried out by vetted teams under S&K's direction.
- Fit-only fitting in Cheltenham
- Fit-only fitting in Cirencester
- Fit-only fitting in Gloucester
- Fit-only fitting in Kingswood
- Fit-only fitting in Mangotsfield
- Fit-only fitting in Stroud
- Fit-only fitting in Tewkesbury
- Fit-only fitting in Yate
What's included
- Upstand height, level and fall checked, and squareness confirmed across the diagonals
- Opening tested where relevant, packaging taken away and paperwork handed back
- Opening and upstand measured against the maker's drawing, timber to timber
- Delivery damage and missing parts — We ask you to open the delivery and check it as soon as it arrives, not on fitting day.
- Internal versus external size — We check whether your rooflight's quoted size is the hole size or the outer frame size.
Rules that apply in England
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Common questions in Gloucestershire
Will my new rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
How long does fitting take?
Fitting a rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

