Guide prices
Onto a ready upstand
Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed
With a new upstand
Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed
Large or heavy unit
Extra hands or lifting gear, larger openings, fixed or opening units
Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Amersham and the districts around it, HP7, HP6 and HP8, all sit inside our working area. So does the ground between Amersham and Chesham (2 miles), and on towards Chalfont St Peter (5 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
Your rooflights or ours
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
What we do on the day
- Internal reveal trimmed or lined, with the protective film removed at the end
- Unit bedded on the sealant or tape the maker specifies, then screw-fixed
- Roof membrane dressed up the kerb and finished under the drip edge
- Internal versus external size — We check whether your rooflight's quoted size is the hole size or the outer frame size.
- Delivery damage and missing parts — We ask you to open the delivery and check it as soon as it arrives, not on fitting day.
Fitting your rooflight, step by step
Where a job takes half a day to a day, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then a rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Planning and building rules in England
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
What to send for a quick quote
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around HP7 and we will come back with a quote or a survey date.
Common questions in Amersham
Will my new rooflight leak?
A correctly fitted unit should not. Leaks usually trace back to the detail around the frame: an upstand that is too low, a membrane or flashing that is not dressed properly, sealant applied to a damp surface, or water ponding against the kerb. We fit to the maker's instructions and check each of those points. The fitting carries a written workmanship guarantee, with its terms set out on your quote.
Can you fit the rooflight I bought online?
Yes, fit-only is one of our core services. Send the product link or spec, photos of the roof and rough sizes, and we can usually price it from those. Before fitting we check the delivery for damage, which should be reported to the seller, plus the size against the builder's opening and the upstand height. The product warranty stays with the maker or seller, and our guarantee covers the fitting.
How long does fitting take?
Fitting a rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Tell us your postcode, HP7 or close by, and what you want fitted. We will reply with the next steps and a quote.