Irvine guide prices
Onto a ready upstand
Customer-supplied unit up to about 1.5 m², fitted to a prepared kerb, sealed and trimmed
With a new upstand
Insulated timber upstand built, membrane turned up and dressed, unit fitted and sealed
Large or heavy unit
Extra hands or lifting gear, larger openings, fixed or opening units
Guide ranges for labour only — you supply the rooflight. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building warrant fees, where a job needs them, are shown as their own line.
Coverage in and around Irvine
Jobs across KA12, KA11 and KA13 are part of our normal cover for Irvine. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Kilwinning and Kilmarnock are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.
Fit-only or supply and fit
Your unit or ours, the fitting standard is the same. For supply and fit we choose a rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.
What we do on the day
- Opening tested where relevant, packaging taken away and paperwork handed back
- Opening and upstand measured against the maker's drawing, timber to timber
- Unit bedded on the sealant or tape the maker specifies, then screw-fixed
- Internal versus external size — We check whether your rooflight's quoted size is the hole size or the outer frame size.
- Access and lifting — We check how the unit gets from your drive to the roof.
How a fitting day runs
Morning first: the team arrives, introduces itself and walks through the job with you. Dust sheets go down in the room below and along the route in. Then the opening and upstand, or the flashing on a pitched roof, are checked against the unit's measurements. A rooflight goes in, is fixed to the maker's pattern and sealed into the roof covering. Inside, the reveal is finished as quoted. Before leaving, the team clears debris and talks you through what was done. Most jobs of this type take half a day to a day.
Planning and building rules in Scotland
In Scotland, forming a new rooflight opening needs a building warrant from the council, because the roof is being altered. Replacing an existing rooflight complete with its frame doesn't need a warrant, but the new unit still has to meet the building standards, including the 1.6 W/m²K energy figure for windows and rooflights in alterations. Planning depends on the house and where it is: householder permitted development rights don't apply in conservation areas, and listed buildings need consent. We confirm this with you before quoting.
Getting a price from photos
Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in KA12, and we can price it.
Common questions in Irvine
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Do you cover Irvine?
Yes. Fitters travel to addresses in Irvine and the surrounding districts, including KA12. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
How long does fitting take?
Fitting a rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Ask for a quote for your Irvine roof. Survey dates are offered based on fitter availability once you are happy with the price.

