What the job costs in Woking
Small opening
Up to about 1000 × 1000 mm with actuator, rain sensor and switch or remote
Medium opening
Larger units, wall switch and remote
Large opening
Big or heavy units, extra actuators
Guide ranges for supply & fit; the electrician's final connection is quoted separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around Woking we cover
Distance is rarely the deciding factor. A roof in Chertsey, 5 miles from Woking, gets the same survey, the same written quote and the same fitting process as one in GU22, GU21 and GU23. What changes the price is the job itself: size of unit, roof type, access and lifting. Weybridge, around 6 miles out, is treated the same way.
Fit-only or supply and fit
Supply and fit tends to suit people who would rather not pick a unit from a catalogue. We look at the roof, the opening and how you use the room, then put an electric opening rooflight on the quote that fits all three. Fit-only suits people who already know what they want, or have one on site. We are happy with either. The difference is who stands behind what: on fit-only, the maker or retailer covers the product, and our workmanship guarantee covers the installation.
What the job includes
- Cable route and controls set up ready for the electrician's final connection, quoted as a separate line
- Upstand checked or built to suit the unit and its actuator housing
- Unit fitted, sealed and weathered like a fixed flat rooflight
- Cable length and size — We check the cable run against the maker's limits before planning where the controls go.
- Who makes the final connection — We confirm who will connect the rooflight to the mains before booking.
From arrival to clean-up
Where a job takes one day, plus the electrician's connection, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then an electric opening rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.
Regulations for Woking properties
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
What to send for a quick quote
Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in GU22, and we can price it.
Common questions in Woking
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
How long does fitting take?
Fitting an electric opening rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Do I need planning permission for a rooflight in Woking?
Often not. Many rooflights fall under permitted development, provided they do not project beyond the national limit and meet the other conditions that apply in England. Conservation areas, listed buildings and some flats are different and may need consent. Because the rules depend on the property, we confirm what is likely to apply at your address and point you to the planning authority where an application is needed.
Got a unit waiting to go in, or need one sourced? Either way, start with your Woking address and a couple of photos.