Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Evington · LE2 · Leicestershire

Electric opening rooflight installation in Evington

Already bought an electric opening rooflight, or still deciding which one to get? Both are fine. For electric opening rooflight installation in Evington we either source a suitable unit and install it, or fit the one waiting in your garage. Fit-only jobs are usually priced from your photos and measurements, while supply-and-fit and replacement jobs get a free survey first. Whichever route you take, the opening, the upstand or flashing, and the delivery are checked before anything is fixed down. Properties in LE2 and the surrounding districts are covered on the same terms.

Guide price from £2,645 · Supply & fit; the electrician's final connection is quoted separately

Guide prices in Evington

Small opening

£2,645 – £3,595including VAT at 20%

Up to about 1000 × 1000 mm with actuator, rain sensor and switch or remote

Medium opening

£3,595 – £4,795including VAT at 20%

Larger units, wall switch and remote

Large opening

£4,795 – £6,945including VAT at 20%

Big or heavy units, extra actuators

Guide ranges for supply & fit; the electrician's final connection is quoted separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Fitting across Evington and nearby

Evington and the districts around it, LE2, LE18 and LE5, all sit inside our working area. So does the ground between Evington and Oadby (1 mile), and on towards Wigston Magna (2 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.

Buying your own, or letting us supply

There are two ways to do this. Supply and fit means we source an electric opening rooflight that suits your roof and install it, so one company answers for both the product choice and the fitting. Fit-only means you buy the unit and we install it. With fit-only, the product warranty stays with the maker or seller, and our written guarantee covers the fitting work. Both routes get the same checks on the opening, the upstand and the maker's instructions before anything is fixed.

On the day, we cover

  • Cable route planned through the kerb or reveal before the lining goes on
  • Cable route and controls set up ready for the electrician's final connection, quoted as a separate line
  • Rain sensor positioned where it will get wet when rain starts
  • Rain sensor position — We place the rain sensor where rain will reach it quickly and debris will not cover it.
  • Cable length and size — We check the cable run against the maker's limits before planning where the controls go.

From arrival to clean-up

Where a job takes one day, plus the electrician's connection, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then an electric opening rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.

Planning, building control and Evington

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

What to send for a quick quote

Start with your phone. Take a picture of the roof where the unit goes or already sits, then one from inside looking up. Measure what you can, even roughly. Tell us what the roof is covered with and how a fitter would reach it: ladder, garden access or scaffold. Bought it already? Send the link or spec. Add your full postcode, for example in LE2, and we can price it.

Common questions in Evington

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Do you offer trade rates for builders and roofers?

We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.

What upstand height and roof pitch does electric opening rooflight fitting need?

It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.

For a free, no-obligation quote in Evington, use the form or call us with the details of your roof.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Electric opening in Evington

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote