Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Folkestone · CT20 · Kent

Electric opening rooflight installation in Folkestone

If the electric opening rooflight on your roof now is misted, discoloured, cracked or letting water in, replacing it is often simpler than people expect. The old unit comes out, we inspect the kerb or frame underneath, and we decide with you whether it can be reused or needs rebuilding. Then the new one goes in, sealed to the roof covering and finished inside. We handle this kind of electric opening rooflight installation in Folkestone and nearby, alongside new openings and fit-only work. Postcode CT20 and its neighbours are all within our cover.

Guide price from £2,645 · Supply & fit; the electrician's final connection is quoted separately

Guide prices

Small opening

£2,645 – £3,595including VAT at 20%

Up to about 1000 × 1000 mm with actuator, rain sensor and switch or remote

Medium opening

£3,595 – £4,795including VAT at 20%

Larger units, wall switch and remote

Large opening

£4,795 – £6,945including VAT at 20%

Big or heavy units, extra actuators

Guide ranges for supply & fit; the electrician's final connection is quoted separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Where our fitters travel

Folkestone and the districts around it, CT20, CT19 and CT18, all sit inside our working area. So does the ground between Folkestone and Dover (7 miles), and on towards Ashford (13 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.

Already bought your unit?

If you have bought an electric opening rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.

On the day, we cover

  • Wall switch, remote receiver or control box fixed in place
  • Opening and closing tested, with controls explained at handover
  • Unit fitted, sealed and weathered like a fixed flat rooflight
  • Rain sensor position — We place the rain sensor where rain will reach it quickly and debris will not cover it.
  • Opening onto a side slope — We check where the opening part will sit if the roof is pitched or the unit faces a neighbour.

What happens on the day

Where a job takes one day, plus the electrician's connection, the split is usually structural work first and finishing second. Early on, the fitters cut or prepare the opening, trim where needed and prepare the upstand or flashing. Then an electric opening rooflight is lifted in, fixed and made weathertight so the roof is sound before anyone moves inside. Plasterboard, trim and filler for the reveal come after. Each evening the work area is swept, and at the end the glass is cleaned and the team talks you through what was done.

Planning and building rules in England

In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.

Details that speed up your quote

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, CT20 or nearby, confirms travel.

Common questions in Folkestone

How does payment work?

Payment terms are set out on your written quote before you accept it. Depending on the job, that may mean a deposit, stage payments for larger work, or payment on completion. The contract is with S&K Property Investments and Improvement Ltd, part of the S&K Group. Nothing is added without your agreement: if something unexpected comes up, we discuss it and agree any change before carrying on.

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

What if my roof opening is the wrong size for the electric opening rooflight?

We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.

Ask for a quote for your Folkestone roof. Survey dates are offered based on fitter availability once you are happy with the price.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Electric opening in Folkestone

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote