What the job costs in Yate
Small opening
Up to about 1000 × 1000 mm with actuator, rain sensor and switch or remote
Medium opening
Larger units, wall switch and remote
Large opening
Big or heavy units, extra actuators
Guide ranges for supply & fit; the electrician's final connection is quoted separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Where our fitters travel
If you also own a property or a business unit in Mangotsfield, Kingswood or Keynsham, that is no problem. We can survey and quote both, and where it suits, line the fitting days up together. Every address is reached by fitters travelling to it from their current jobs, and BS37, BS36 and GL9 sit comfortably within that pattern.
Buying your own, or letting us supply
If you have bought an electric opening rooflight yourself, we check four things before fitting. First, the delivery: open it, look for chips, cracks and bent frames, and report any damage to the seller straight away. Second, the size, measured against the builder's opening rather than the external frame. Third, the upstand height above the finished roof. Fourth, the maker's instructions, which set the fixings and sealing. Product warranty claims go to the seller and maker; our guarantee is for how it was fitted.
On the day, we cover
- Unit fitted, sealed and weathered like a fixed flat rooflight
- Rain sensor positioned where it will get wet when rain starts
- Cable route planned through the kerb or reveal before the lining goes on
- Cable length and size — We check the cable run against the maker's limits before planning where the controls go.
- Where power comes from — We find a sensible power supply for the rooflight before fitting day.
What happens on the day
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack an electric opening rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes one day, plus the electrician's connection.
Planning and building rules in England
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Getting a price from photos
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, BS37 or a neighbouring district.
Common questions in Yate
What if my roof opening is the wrong size for the electric opening rooflight?
We find out before the fitting day, not on it. If the opening is slightly out, it can usually be adjusted by trimming or by packing out the upstand. If it is a long way off, the choice is between altering the opening and changing the unit. Bear in mind that rooflights are often sold by builder's opening size rather than external size, so check which one your measurement refers to.
What upstand height and roof pitch does electric opening rooflight fitting need?
It depends on the product. Manufacturers usually specify a minimum upstand height above the finished roof surface, and a minimum pitch on the glass so rain runs off. We follow the maker's figures for your unit rather than a rule of thumb. If your existing kerb or roof falls short, we explain the options, such as raising the upstand or choosing a unit with built-in pitch.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
Planning an electric opening rooflight in Yate? Tell us about the roof and we will come back with a clear price in writing.