Guide prices
Small opening
Up to about 1000 × 1000 mm with actuator, rain sensor and switch or remote
Medium opening
Larger units, wall switch and remote
Large opening
Big or heavy units, extra actuators
Guide ranges for supply & fit; the electrician's final connection is quoted separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Is your address covered?
Fitters travel to the job, so the address is what counts. In Derry/Londonderry that means postcode districts BT48, BT47 and BT49, and the same teams can just as easily take on work in Coleraine, about 27 miles away, or Omagh at roughly 27 miles. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
What we check on a supplied unit
Which works out better, buying your own or letting us supply? It depends on what you value. Buying your own gives you control of the product and what you pay for it. Letting us supply puts the whole job, unit and fitting, under one written quote. On a customer-supplied unit we still measure it against the opening, look at the upstand, and inspect the condition it arrived in. Warranty on the product sits with whoever sold it, while the fitting carries our own guarantee.
On the day, we cover
- Cable route planned through the kerb or reveal before the lining goes on
- Cable route and controls set up ready for the electrician's final connection, quoted as a separate line
- Opening and closing tested, with controls explained at handover
- Rain sensor position — We place the rain sensor where rain will reach it quickly and debris will not cover it.
- Where power comes from — We find a sensible power supply for the rooflight before fitting day.
Fitting your electric opening rooflight, step by step
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for an electric opening rooflight: one day, plus the electrician's connection, weather permitting.
Planning, building control and Derry/Londonderry
Northern Ireland has its own rules. Permitted development for rooflights on a house requires the unit to sit below the highest part of the roof, project no more than 15 cm where the slope faces a road, and stay at least half a metre from the ridge, eaves, party wall and verge. It doesn't apply in conservation areas or within the grounds of a listed building. For building control, structural roof alterations need an application, and rooflights must meet WER Band C or 1.6 W/m²K.
Before you get in touch
Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around BT48. That is enough for a first price.
Common questions in Derry/Londonderry
How long does fitting take?
Fitting an electric opening rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Do you cover Derry/Londonderry?
Yes. Fitters travel to addresses in Derry/Londonderry and the surrounding districts, including BT48. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
What is included in the price?
The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.
Questions before you commit? Send them over with your Derry/Londonderry postcode and we will answer them plainly, with a quote alongside.

