Newry guide prices
Small opening
Up to about 1000 × 1000 mm with actuator, rain sensor and switch or remote
Medium opening
Larger units, wall switch and remote
Large opening
Big or heavy units, extra actuators
Guide ranges for supply & fit; the electrician's final connection is quoted separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering BT35 and neighbouring districts
Covering Newry means covering the people who live and work there, not a single postcode. We take on domestic and commercial jobs in BT35, BT34 and BT32, and are happy to quote further out in Banbridge and Portadown. If your address sits between towns, tell us and we will confirm whether it falls in our normal area or needs travel set out separately on the quote.
Your electric opening rooflights or ours
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack an electric opening rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
Included in the work
- Wall switch, remote receiver or control box fixed in place
- Cable route and controls set up ready for the electrician's final connection, quoted as a separate line
- Rain sensor positioned where it will get wet when rain starts
- Rain sensor position — We place the rain sensor where rain will reach it quickly and debris will not cover it.
- Where power comes from — We find a sensible power supply for the rooflight before fitting day.
Fitting your electric opening rooflight, step by step
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for an electric opening rooflight: one day, plus the electrician's connection, weather permitting.
Planning and building rules in Northern Ireland
In Northern Ireland, the energy standard for a new or replacement rooflight or roof window in an existing home is WER Band C or a U-value of 1.6 W/m²K, under Technical Booklet F1. Cutting a new opening alters the roof structure, so a building control application is expected; confirm with the council's building control team. Planning permitted development covers many rooflights on houses if they stay below the ridge, project no more than 15 cm on a road-facing slope and sit at least 0.5 m from the ridge, eaves and verges.
Before you get in touch
What we cannot see, we have to guess, and guesses make quotes wider. So the more you send, the tighter the price. Useful: shots from the roof or garden, shots from the room underneath, a rough width and length, the roof finish, any access problems, and the product page if you have already ordered. Add the property postcode around BT35 and we will come back with a quote or a survey date.
Common questions in Newry
Do you need scaffolding to fit a rooflight?
Not always. Single-storey roofs can often be reached safely with ladders, a tower or edge protection. Higher roofs, steep pitches and large units usually need scaffold or a mobile platform, and heavy glass may need a crane. We assess access from your photos or at the survey, and any scaffold or lifting cost is shown as its own line on the written quote.
How long does fitting take?
Fitting an electric opening rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
Get in touch with the details of your Newry property and we will explain what the job involves and what it costs.

