Guide prices in Huntingdon
Small opening
Up to about 1000 × 1000 mm with actuator, rain sensor and switch or remote
Medium opening
Larger units, wall switch and remote
Large opening
Big or heavy units, extra actuators
Guide ranges for supply & fit; the electrician's final connection is quoted separately. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Coverage in and around Huntingdon
Huntingdon and the districts around it, PE29, PE28 and PE27, all sit inside our working area. So does the ground between Huntingdon and St Ives (5 miles), and on towards St Neots (9 miles). When a fitting team is booked, their travel is already in the quoted price, so it does not turn up as a surprise line on the final bill.
Buying your own, or letting us supply
Your unit or ours, the fitting standard is the same. For supply and fit we choose an electric opening rooflight to suit the roof and price it with the installation. For fit-only we work with what you have, after confirming it arrived undamaged, that it matches the builder's opening, and that the upstand will sit at the height the maker asks for. Report any transit damage to the seller, as the product cover is theirs and the maker's. Our written guarantee applies to the fitting itself.
Included in the work
- Cable route and controls set up ready for the electrician's final connection, quoted as a separate line
- Cable route planned through the kerb or reveal before the lining goes on
- Rain sensor positioned where it will get wet when rain starts
- Opening onto a side slope — We check where the opening part will sit if the roof is pitched or the unit faces a neighbour.
- Where power comes from — We find a sensible power supply for the rooflight before fitting day.
How a fitting day runs
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for an electric opening rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning, building control and Huntingdon
Two sets of rules matter in England. Planning: a rooflight on a house is normally permitted development if it projects no more than 0.15 m and stays below the highest part of the roof, but flats, listed buildings and Article 4 areas need checking. Building regulations: new openings need approval for the structure and energy performance, and a replacement is a controlled fitting. We are not registered with a competent person scheme, so we notify replacements to building control with a building notice and put the council's fee on the quote.
Details that speed up your quote
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, PE29 or a neighbouring district.
Common questions in Huntingdon
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
Got a unit waiting to go in, or need one sourced? Either way, start with your Huntingdon address and a couple of photos.