Staines guide prices
Like-for-like dome
Old dome taken off, new multi-skin dome fixed to the sound existing kerb
Dome with kerb adaptor
New dome where the kerb needs an adaptor or packing
Upgrade to glass
Dome swapped for a double-glazed glass rooflight on the existing sound kerb, as in our replacement service
Guide ranges for supply & fit, per dome; building control notice fee extra on homes in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering TW18 and neighbouring districts
Our fitters come to you. For Staines that covers TW18, TW19 and TW20, plus nearby Egham and Ashford. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
Your dome rooflights or ours
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a dome rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
Included in the work
- Kerb top cleaned of old sealant, fixings and loose felt
- Old dome unscrewed, lifted off and taken away
- New multi-skin dome or glass unit fixed and sealed
- Kerb size and adaptors — We measure every kerb against the new dome's sizes.
- Fragile dome safety — We treat old domes as fragile at all times.
From arrival to clean-up
Arrive and agree the plan. Sheet the floor and furniture. Set up the ladder, tower or scaffold. Check the opening, the upstand or flashing, and the unit against the paperwork. Fix and pack a dome rooflight level. Seal it into the roof. Line the reveal or fit the ceiling trim. Clean the glass, clear the waste, and talk you through it. That is the shape of most fitting days, and for this type of job it usually takes a few hours per dome.
Do you need permission in Staines?
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Help us quote accurately
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, TW18 or a neighbouring district.
Common questions in Staines
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
How long does fitting take?
Fitting a dome rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Got a unit waiting to go in, or need one sourced? Either way, start with your Staines address and a couple of photos.