Dome rooflight replacement in Horley

If the dome rooflight on your roof now is misted, discoloured, cracked or letting water in, replacing it is often simpler than people expect. The old unit comes out, we inspect the kerb or frame underneath, and we decide with you whether it can be reused or needs rebuilding. Then the new one goes in, sealed to the roof covering and finished inside. We handle this kind of dome rooflight replacement in Horley and nearby, alongside new openings and fit-only work. Postcode RH6 and its neighbours are all within our cover.

Guide price from £395 · Supply & fit, per dome; building control notice fee extra on homes in England and Wales

Horley guide prices

Like-for-like dome

£395 – £695including VAT at 20%

Old dome taken off, new multi-skin dome fixed to the sound existing kerb

Dome with kerb adaptor

£695 – £1,195including VAT at 20%

New dome where the kerb needs an adaptor or packing

Upgrade to glass

£1,095 – £1,695including VAT at 20%

Dome swapped for a double-glazed glass rooflight on the existing sound kerb, as in our replacement service

Guide ranges for supply & fit, per dome; building control notice fee extra on homes in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering RH6 and neighbouring districts

Distance is rarely the deciding factor. A roof in Crawley, 4 miles from Horley, gets the same survey, the same written quote and the same fitting process as one in RH6, RH1 and RH2. What changes the price is the job itself: size of unit, roof type, access and lifting. Redhill, around 5 miles out, is treated the same way.

Buying your own, or letting us supply

A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a dome rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.

On the day, we cover

  • Kerb checked for rot, size and height before the new unit goes on
  • Inside checked for drips and the trim refitted
  • Old dome unscrewed, lifted off and taken away
  • Multi-skin domes and energy — We fit multi-skin domes rather than single-skin ones as replacements.
  • Kerb size and adaptors — We measure every kerb against the new dome's sizes.

A typical installation day

Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a dome rooflight: a few hours per dome, weather permitting.

Do you need permission in Horley?

England's rules in short: permitted development usually covers a rooflight on a house roof provided it doesn't stick out more than 0.15 m or rise above the ridge, though a listed building always needs consent and some streets have Article 4 directions. Building regulations apply to new openings, and replacements go through building control; as we are not registered with a competent person scheme, we use a building notice and show the fee on the quote. The energy limit for rooflights in existing homes is 2.2 W/m²K, and the 2026 Approved Document L, in force from 24 March 2027, keeps that figure.

Details that speed up your quote

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, RH6 or nearby, confirms travel.

Common questions in Horley

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

What is included in the price?

The written quote lists it line by line. Typically that covers fitting labour, fixings, sealants, membrane or flashing materials, any upstand work, internal finishing if agreed, and taking away the waste. For supply and fit, the unit itself is included too. Scaffold, lifting gear and any third-party fees, where needed, are shown separately so you can see what each part of the job costs.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Questions before you commit? Send them over with your Horley postcode and we will answer them plainly, with a quote alongside.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Dome replacement in Horley

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote