Fit-onlySupply & fitReplacementsTrade fitting
Fitting teams across England, Wales, Scotland & NI · Call 0800 088 6248
RooflightInstallers.co.uk
Herne Bay · CT6 · Kent

Dome rooflight replacement in Herne Bay

Dome rooflight replacement in Herne Bay comes down to what happens around the glass. A good unit sat on a poor upstand, or with the membrane or flashing cut short at the corners, will still let water in. We fit each dome rooflight to the maker's instructions for fixings, packers and sealant, for homes and businesses across Herne Bay and the rest of Kent. That covers supply and fit, fit-only for a unit you already own, and swapping out a tired one. Every job starts with a written quote, so the price and scope are clear before anyone climbs a ladder.

Guide price from £395 · Supply & fit, per dome; building control notice fee extra on homes in England and Wales

Guide prices

Like-for-like dome

£395 – £695including VAT at 20%

Old dome taken off, new multi-skin dome fixed to the sound existing kerb

Dome with kerb adaptor

£695 – £1,195including VAT at 20%

New dome where the kerb needs an adaptor or packing

Upgrade to glass

£1,095 – £1,695including VAT at 20%

Dome swapped for a double-glazed glass rooflight on the existing sound kerb, as in our replacement service

Guide ranges for supply & fit, per dome; building control notice fee extra on homes in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.

Covering CT6 and neighbouring districts

Jobs across CT6, CT5 and CT2 are part of our normal cover for Herne Bay. We are not an office on the high street. Our fitting teams come out to the property from wherever they are working that week. Neighbouring places such as Whitstable and Canterbury are covered on the same terms, so a house on the edge of town is no harder to book than one in the centre.

Already bought your unit?

A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a dome rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.

Included in the work

  • Kerb checked for rot, size and height before the new unit goes on
  • Adaptor or packing fitted where the old kerb needs it
  • Membrane checked where it meets the kerb, with small repairs made
  • Fragile dome safety — We treat old domes as fragile at all times.
  • Upgrading to glass — We check whether the kerb suits a glass unit before recommending one.

From arrival to clean-up

Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a dome rooflight: a few hours per dome, weather permitting.

Regulations for Herne Bay properties

Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.

Getting a price from photos

Each detail you send takes a question off our list. Photos inside and out show the opening and the ceiling. Rough measurements tell us the unit size. The roof covering tells us how it will be sealed in. Access notes tell us whether a tower or scaffold is needed. A product link, if you have one, lets us check it against the opening. Your postcode, CT6 or nearby, confirms travel.

Common questions in Herne Bay

Does a rooflight need building regulations approval?

A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.

Do you make good inside after fitting?

Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.

Can you remove and dispose of the old rooflight?

Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.

Got a unit waiting to go in, or need one sourced? Either way, start with your Herne Bay address and a couple of photos.

Rear extension at dusk with lit rooflights and a roof lantern
Ready when you are

Dome replacement in Herne Bay

Send photos and rough sizes, or ask for a survey for install work. One fixed written price before anything starts.

CallGet a quote