Guide prices
Like-for-like dome
Old dome taken off, new multi-skin dome fixed to the sound existing kerb
Dome with kerb adaptor
New dome where the kerb needs an adaptor or packing
Upgrade to glass
Dome swapped for a double-glazed glass rooflight on the existing sound kerb, as in our replacement service
Guide ranges for supply & fit, per dome; building control notice fee extra on homes in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering M27 and neighbouring districts
Our fitters come to you. For Swinton that covers M27, M30 and M28, plus nearby Eccles and Walkden. We do not keep a yard or showroom in the area, and you do not need to visit one. The survey happens at your property or, for fit-only work, from the photos you send. Dates follow fitter availability, which we confirm when you accept the quote.
Already bought your unit?
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a dome rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
Included in the work
- Inside checked for drips and the trim refitted
- Kerb top cleaned of old sealant, fixings and loose felt
- New multi-skin dome or glass unit fixed and sealed
- Kerb size and adaptors — We measure every kerb against the new dome's sizes.
- Is the kerb sound? — We check each kerb for rot and movement before quoting a dome swap.
How a fitting day runs
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a dome rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Do you need permission in Swinton?
Replacing a rooflight in an English home is a controlled fitting: it has to be self-certified by a scheme-registered installer or notified to building control. We are not registered with a competent person scheme, so replacements we fit are notified with a building notice, and the new unit has to meet current energy limits. Adding a new one usually means a building regulations application, because joists or rafters are trimmed. On the planning side, most house rooflights are permitted development if they project 0.15 m or less; on a side slope the glass must be obscured and fixed unless the opening part is over 1.7 m above the floor.
Before you get in touch
A fast quote needs five things: a photo of the roof from outside, one from the room below, rough sizes of the opening or the space, the roof covering (felt, single-ply, fibreglass, tiles, slate or metal), and a note on access. If you have already bought the unit, add the product link or spec sheet. And give us the postcode, M27 or a neighbouring district.
Common questions in Swinton
Do you offer trade rates for builders and roofers?
We carry out subcontract fitting for builders, roofers, extension companies and commercial contractors. Pricing is per job or per schedule of units, agreed in writing before we start. We can work to your programme, fit on your upstand or build our own, and leave the opening ready for the next trade. Send drawings or a unit schedule and we will come back with a trade quote.
Can you replace an old dome without redoing the whole roof?
Usually, yes. If the existing kerb is sound, level and tall enough, a new unit can often sit on it with a fresh seal to the roof covering. If the kerb is rotten or too low, we rebuild it and patch the covering around it rather than stripping the whole roof. This is checked at the survey and included in the written quote, so you know the full scope first.
How long does fitting take?
Fitting a dome rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Get in touch with the details of your Swinton property and we will explain what the job involves and what it costs.