What the job costs in West Ham
Like-for-like dome
Old dome taken off, new multi-skin dome fixed to the sound existing kerb
Dome with kerb adaptor
New dome where the kerb needs an adaptor or packing
Upgrade to glass
Dome swapped for a double-glazed glass rooflight on the existing sound kerb, as in our replacement service
Guide ranges for supply & fit, per dome; building control notice fee extra on homes in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Areas around West Ham we cover
Fitters travel to the job, so the address is what counts. In West Ham that means postcode districts E13, E15 and E7, and the same teams can just as easily take on work in Stratford, about 1 mile away, or Canning Town at roughly 1 mile. Survey and fitting dates are offered according to fitter availability, and travel is built into the quote rather than added later.
Already bought your unit?
Supply and fit tends to suit people who would rather not pick a unit from a catalogue. We look at the roof, the opening and how you use the room, then put a dome rooflight on the quote that fits all three. Fit-only suits people who already know what they want, or have one on site. We are happy with either. The difference is who stands behind what: on fit-only, the maker or retailer covers the product, and our workmanship guarantee covers the installation.
On the day, we cover
- Kerb top cleaned of old sealant, fixings and loose felt
- New multi-skin dome or glass unit fixed and sealed
- Kerb checked for rot, size and height before the new unit goes on
- Fragile dome safety — We treat old domes as fragile at all times.
- Kerb size and adaptors — We measure every kerb against the new dome's sizes.
What happens on the day
Protection comes before tools. Floors, furniture and stairs get covered, and the ceiling below the opening is sheeted to catch dust. Up top, the fitters confirm the opening is square and the upstand or flashing suits what the maker specifies. Fixing follows, then weather-sealing into the membrane, felt or tiles. Only once the roof is tight do they turn to the internal reveal. Time on site for a dome rooflight: a few hours per dome, weather permitting.
Do you need permission in West Ham?
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Details that speed up your quote
Keep it simple. Two or three photos, outside and inside. Approximate sizes. What the roof is made of. Anything awkward about getting up there, such as a conservatory below, a narrow side path or no parking. If you bought the rooflight online, the link or model name. Then your postcode in or around E13. That is enough for a first price.
Common questions in West Ham
Do you make good inside after fitting?
Yes, where the quote includes it. Internal finishing usually means lining the reveal with plasterboard, taping or skimming, and fitting trim where it meets the ceiling. Some people prefer their own plasterer or decorator to finish off, which is fine. The written quote spells out exactly where our work stops, so nobody is left guessing about who does what once the unit is in.
Can you remove and dispose of the old rooflight?
Yes. Taking out the old unit is part of any replacement job, and it leaves with the rest of the waste unless you ask to keep it. Old domes, glass and frames go through proper waste routes. If removal turns up a rotten kerb or damaged decking, we show you what we have found and agree the repair with you before going any further.
How long does fitting take?
Fitting a dome rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.
Send a few photos and your E13 postcode, and we will put together a written quote for the job.