Guide prices
Like-for-like dome
Old dome taken off, new multi-skin dome fixed to the sound existing kerb
Dome with kerb adaptor
New dome where the kerb needs an adaptor or packing
Upgrade to glass
Dome swapped for a double-glazed glass rooflight on the existing sound kerb, as in our replacement service
Guide ranges for supply & fit, per dome; building control notice fee extra on homes in England and Wales. Your price is fixed in a written quote after we have seen photos or surveyed. Scaffold, access towers or a crane are priced separately if the job needs them, and building control fees, where a job needs them, are shown as their own line.
Covering DT4 and neighbouring districts
Distance is rarely the deciding factor. A roof in Dorchester, 7 miles from Weymouth, gets the same survey, the same written quote and the same fitting process as one in DT4, DT3 and DT5. What changes the price is the job itself: size of unit, roof type, access and lifting. Poole, around 22 miles out, is treated the same way.
Already bought your unit?
A damaged delivery is a frequent snag on fit-only work. Before the day, unpack a dome rooflight, photograph it, and tell the seller about any cracks or scuffs, because claims are much easier made early. We will also ask for the model or a link, so we can read the maker's instructions and check the builder's opening size and the upstand height it expects. If everything lines up, we fit it. If not, we explain what needs changing first.
On the day, we cover
- Inside checked for drips and the trim refitted
- New multi-skin dome or glass unit fixed and sealed
- Kerb top cleaned of old sealant, fixings and loose felt
- Kerb size and adaptors — We measure every kerb against the new dome's sizes.
- Multi-skin domes and energy — We fit multi-skin domes rather than single-skin ones as replacements.
Fitting your dome rooflight, step by step
Fitting days start with a look at the sky. If rain is due, the order of work changes so the roof is never left open to it. A typical day for a dome rooflight runs like this: set up access, protect the room, open up the roof or prepare the existing kerb or frame, check sizes, fix, seal, then finish inside. On jobs that take more than a day, the opening is weather-sealed overnight. The last hour goes on tidying, waste removal and a walk-round with you.
Planning, building control and Weymouth
In England, a new rooflight opening generally needs building regulations approval because the roof structure is altered and the glazing must meet energy rules: 2.2 W/m²K for a rooflight in an existing home, or 1.4 W/m²K (or WER Band B) for a roof window. Planning is often not needed on a house: permitted development covers rooflights that stand no more than 0.15 m proud of the roof slope and sit below the highest part of the roof. Flats, listed buildings and areas with an Article 4 direction are different, so we check your address first.
Before you get in touch
For fit-only work, the product details matter most: the link, the spec sheet, or a photo of the label on the box. Alongside that, send pictures of the roof and the ceiling below, approximate opening sizes, the type of roof covering, and how someone would get onto the roof. For supply and fit, the same photos and sizes do the job. Finish with your postcode, such as DT4.
Common questions in Weymouth
Do you cover Weymouth?
Yes. Fitters travel to addresses in Weymouth and the surrounding districts, including DT4. We do not run an office there; the survey and the fitting happen at your property. A few island and remote postcodes are covered by arrangement; if yours is one, we confirm travel and dates before quoting.
Does a rooflight need building regulations approval?
A new opening usually needs building regulations approval. A replacement is a controlled fitting: it must be self-certified by an installer registered with a competent person scheme or notified to building control. We are not registered with a scheme, so replacements we fit are notified to building control with a building notice, and the council's fee is shown on your quote.
How long does fitting take?
Fitting a dome rooflight into an existing, correctly sized opening is often a day's work. New openings take longer, because joists or rafters need trimming, an upstand or flashing has to be built or fitted, and the inside needs finishing. Large units that need lifting gear, and days lost to rain, can stretch things further. Your written quote gives a realistic estimate for your roof.